UPDATE:
We put in a septic tank and leach lines in June.
We poured a four-foot foundation in August/September.
The electrical lines were run in that time frame, too.
A wellhouse was built to cover the pressure tank.
The satellite dish/cables were also run.
Next project - HOUSE ROUGH IN!
I'll post pictures and updates as we go along...